Lippert Components Corporate Office | Mishawaka

Majority Builders completed the build-out of the new Lippert Components Corporate Office in Edison Lakes, Mishawaka. This 17,380 state of the art office was a Design-Build project that utilized contemporary elements. It is truly an outstanding modern office space.

 

Catalyst One & Two - Ignition Park  I  South Bend

Majority was chosen as the negotiated Design-Builder of these state-of-the-art buildings, Catalyst One & Catalyst Two, located in South Bend’s technology park - Ignition Park. Catalyst One is a 49,000 square foot technology focused building that will be the home to new start-ups and high technology data companies. Catalyst Two is a 50,000 square foot building that is an exciting venture with the University of Notre Dame, General Electric and the city of South Bend. It houses the newly created University of Notre Dame Turbomachinery Laboratory.

 

Furrion Office & Innovation Center | Elkhart, Indiana

Majority Builders was chosen as the designated Design-Builder for the 37,000 sq. ft. Furrion Office & Innovation Center located in the Elkhart East Office Park at the junction of the I-80 Toll Road and County Road 17.

 

Tire Rack Corporate Office Annex | South Bend, Indiana

Viewable from the 80/90 Interstate the new Tire Rack Annex Office and Call Center Building makes a contemporary statement. Majority was awarded the contract for this 3 story, 34,000 sq. ft., competitive bid building project. The white composite metal panels and large areas of glass draws the attention of travelers. Even the open office partition system has tire tread decals to add to the company working environment.

 

OZINGA Office | South Bend, Indiana

This Majority Builders Design-Build project is a great of example of blending the client’s product of concrete into the modern elements of this office. Headquartered in Mokena, IL, Ozinga has been an integral part of Indiana communities since its first Indiana location opened in 1973.

 

LionsHead Specialty Tire & Wheel Corporate Office | Goshen, IN

Majority Builders was chosen as the designated Design-Builder for this 22,668 square foot two story facility that is located on Steury Avenue in Goshen, IN.

At the top of the owners reasons for building this new corporate office were to create a better corporate image and to show investment in the LionsHead employees by providing a state of the art workspace. The office spaces throughout the building utilized the latest in contemporary colors and materials with high efficiency LED lighting. Break areas for the plant personnel on the ground floor features Terrazzo floor, solid surface countertops, and use of several widows that supply natural light, providing a welcome break from the production floor.

This Design-Build project met the exact pricing and contract prior to having Forum Architect’s complete the plans for final construction documents and state plan review.

Solutions...

 

Raymond James | Mishawaka, Indiana

New Raymond James Office interior build-out at 4215 Edison Lakes Pkwy Suite 300 Mishawaka. IN

 

Pokagon Administration Building | Dowagiac, Michigan

The use of bright colors, symbolic  and sustainable design features added to the character of this 19,100 square foot Administration Building for the Pokagon Band of the Potawatomi Indian Tribe. The project included using sustainable practices, closed loop geothermal HVAC, cement board siding, native plantings and other energy saving electrical lighting controls and fixtures.
 

 

American Trust Place | South Bend, Indiana

Majority negotiated the general construction portion of this 36,270 sq. ft. renovation and building addition located downtown South Bend. The project consisted of the demolition of the former All American News stand and Jewelry store tenant spaces, installing new windows, cleaning and reworking the limestone facades of the old historic building.

A five story building addition constructed of structural steel, concrete, brick and limestone, granite, metal stud framing, and spans of aluminum curtain wall window systems was then erected. Majority installed walls and trims of the common lobby area, installed the building elevators and renovated the parking area.

 

Elkhart Chamber of Commerce

Majority Builders was the successful bidder on this competitively bid renovation project. The modern design elements were a departure from the previous dated look.

In keeping with the downtown location, paving brick veneers were applied to the front desk area. The stamped tin ceiling tiles added a nostalgic feel as well.

Custom elements included coffered ceilings with LED lighting, architectural screen elements on the reception desk front, hanging aluminum grids in the conference room and a Chamber Member Sponsor display board.

 

Three Edison Lakes Lobby | Mishawaka, Indiana

 

Hereus-Kulzer | South Bend, Indiana

 

Patrick Industries | Elkhart, Indiana

 

Krieg DeVault | Mishawaka, Indiana